Banner HIF Cabo Negro

HIF Cabo Negro

Punta Arenas, Chile

About

The Cabo Negro e-Fuel facility has a production capacity of 175,000 tons/year of e-Methanol that can be totally or partially converted to e-Gasoline and e-LG, reaching a maximum production of 70,000 tons/year of e-Gasoline and 8,030 tons/year of e-LG. The facility will be powered by renewable energy from the Faro del Sur wind park (372 MW).

The wind park will have a 3D radar-assisted detention system, and it includes a 110 kV underground transmission line, which will be located between km 36 and 26.5 of Route 9 north in the Cabo Negro industrial sector.

HIF Cabo Negro considers using CO₂ from three alternative sources: biomass conversion, direct air capture and other industrial sources.

About Cabo Negro

Project updates

  • Environmental permits submitted 4Q2023
  • Pre-FEED completed. FEED started 1Q2024
  • Commercial agreement with chilean national petroleum company ENAP to accelerate the development of e-Fuels in Chile
  • HoA signed with Mabanaft and LOI’s with Uniper & eFuel GmbH
  • Early Citizen Participation (known as PACAs in Spanish) in 2022 and 2023 before submitting the environmental impact studies
Project updates Cabo Negro 01
Project updates Cabo Negro 02
Project updates Cabo Negro 03
Project updates Cabo Negro 04
Project updates Cabo Negro 05
Project updates Cabo Negro 06

Key facts

175,000 tons/year e-Methanol production

215,000 tons/year CO₂ recycled

287 MW electrolyzer capacity

~900 jobs during construction and ~400 direct jobs during operations

US $ 1.3 billion to be invested